logo image

TOP-LOADING & FRONT-LOADING

Washing machine development process

PROCESS

01

Benchmarking & Exterior Design

Benchmarking (optional)
Idea Sketch
Design Rendering
Exterior Design
Design Mock-up (optional)

PROCESS

02

Structural Design & PCB Design

Structural Design
PCB Design (H/W & S/W)
Electrical Component Design

PROCESS

03

Simulation Analysis (Driving Unit)

Simulation analysis of structural drawing
(Use of analysis program-optional)

PROCESS

04

Prototype Production & Prototype Test

Prototype Production
Performance Test
Design Modification

PROCESS

05

Mold Production & 1st Mold Modification

Mold Production
1st Sample Check
Primary Mold Modification

PROCESS

06

DPP Prototyping and Testing

DPP Prototyping
DPP Prototype Testing
Secondary Mold Modification

PROCESS

07

LPP Prototyping and Testing

LPP Prototyping
LPP Prototype Testing
3rd Mold Modification

PROCESS

08

Mass Production

1st Mass Production Follow-up
Maintenance (optional)

Tea Bag & Mesh / Fabric

Performance Test List

Category Test / MR / SL Model / Tit
Tea Bag Biodegradable PLA Mesh PLA Mesh
Biodegradable PLA NW PLA NW
Nylon TBF(N)
Polyester TBF(P)
Polyester NWF(P)
PP-PE NWF(E)
Tea Bag Tagging M/C ST-M80
Outer Envelope Tea Bag M/C EV-M50
Mesh Thermal adhesive mesh tape CMT-48
Various Molding VMM
Fabric Mesh count : 40inch BKP-40T
Thread Diameter 20 BKP-105T
Opening Size : 65.2 BKP-230T
Open area : 17% BKP-380T